Dr Al Jarratt

Dr Al Jarratt

, Chartered, BSc (Hons) MSc PhD Eur Ing CEng CMngr FICE FCIHT FCMI MCIArb MAE MEWI QDR Construct Consultants
Membership Status: Mediator

Results and Memberships

Total Mediations Undertaken: 784 Thumbs-up Rating: πŸ‘ 97% Member Level: Elite Mediator Member Type: Non-exclusive Member

Al is a Member of:

Profile

General Information

"Counsel and ourselves valued immensely Dr Jarratt's deep engagement with the Parties and creative approach to break deadlocks and produce the final settlement."

"Very pleased with Dr Al Jarratt's time and commitment and extra effort in unravelling a difficult situation which encountered further unexpected problems before a resolution could become possible."

"Counsel, solicitor and ourselves were most impressed by Dr Jarratt's excellent approach. A superb mediator producing the perfect settlement quickly and cost effectively."

A highly respected member of the profession. Highly qualified and accredited and a Fellow of several Chartered Institutions. Experienced Team Leader and a well-known Main Speaker/Workshops Leader at flagship national and regional professional events. Member of the Editorial Advisory Panel for the bi-monthly international Management, Procurement and Law.

Highly experienced International Commercial Mediator and Dispute Resolver in construction, property, commercial and other disputes including mediating by telephone. Extensive experience in mediating disputes in the UK and the Middle East amongst other regions with a 93% success rate. Adjudicated and arbitrated numerous construction disputes. Also acted as Conciliator, Expert Determiner, Expert Witness, International Arbitrator and Early Neutral Evaluator.

DR AL JARRATT'S  DISPUTE RESOLUTION EXPERIENCE

Qualifications:    Chartered, BSc MSc PhD

                               Eur Ing CEng CMngr FICE FCIHT FCMI MCIArb MAE MEWI QDR

Accreditations:

Mediator

  • Practising Certified International Commercial Mediator
  • Institution of Civil Engineers' Mediator/Conciliator
  • Clerksroom's Mediator
  • Civil Disputes Mediator
  • Association of Mediation Assessors, Trainers and Instructors
  • Mayor's & City of London Court's Mediator

Adjudicator

  • Practising Adjudicator
  • Royal Institute of British Architects' Adjudicator
  • Construction Industry Council's Adjudicator
  • Highways Agency's Adjudicator
  • Named Adjudicator on a national contractor's Standard Forms of Contract

Expert Determiner/Witness

  • Practising Expert Determiner and Expert Witness
  • Member of the Expert Witness Institute
  • Member of the Expert Witness Institute's Professional Bodies Advisory Group
  • Vetted Expert on the UK Register of Expert Witnesses
  • Sweet & Maxwell's Checked Expert

Summary

  • Experienced dispute resolution professional with a varied and successful record in all sectors. Chartered at Fellow level with creative approaches to problem solving. Extensive experience in contractual issues and resolution of disputes having mediated over 1,000 different disputes, and adjudicated and arbitrated numerous others.
  • Vice Chairman of the Committee of the Chartered Institute of Arbitrators, East.
  • Past Member of the Chartered Management Institute’s Eastern Board.
  • Member of the Editorial Advisory Panel of the bi-monthly international Management, Procurement & Law.
  • Professional Reviewer for two chartered institutions.

Mediation Mentor/Speaker

  • Headed technical staff training including the contractual aspects of construction works.?
  • Trained prospective mediators as Pupils in actual mediations
  • Main Speaker at conferences and symposia on mediation, contracts and the avoidance and resolution of disputes.
  • Speaker launching mediation at the Institution of Structural Engineers' 75th anniversary alongside two Past Presidents with the then President in the Chair.
  • Speaker at the Chartered Institute of Arbitrators' Annual Surgery, East Anglia, on my experience as Mediator in my regular mediations
  • Speaker/Workshops Leader at the Institution of Civil Engineers' flagship Annual ADR Day
  • Speaker/Workshop Leader at the Chartered Institute of Arbitrators’ regional and national annual events.
  • Workshop Leader at the Chartered Institute of Arbitrators' flagship Annual Mediation Symposium
  • Speaker at the Association of Mediation Assessors, Trainers & Instructors' annual international conference.
  • Acted as Mediator and Mediation Judge for the Worshipful Company of Arbitrators
  • Speaker on the live Midmorning programme on BBC Radio Humberside alongside an MP and Past President of the Freight Traffic Association.
  • Invited to appear as a sole morning adviser on the live Sky News television channel

Mediation Publications

  • Wrote papers on the settlement of disputes including Alternative Dispute Resolution
  • Wrote a paper on cost-effective mediation in The Structural Engineer
  • Wrote a paper on achieving mediated settlements in the bi-monthly international Management, Procurement & Law Journal
  • Wrote a paper on successful mediations in the Chartered Institute of Arbitrators' Book of Proceedings.
  • Member of the Editorial Advisory Panel of the bi-monthly international Management, Procurement & Law
  • Featured individually in a main article on training of other professionals in The New Builder
  • Featured on the topic of mediation in the Chartered Institute of Arbitrators' quarterly Resolver publication
  • Advised/featured in the technical press and various periodicals
  • Advised/featured in The New Builder, Ideal Homes and Reader’s Digest

Experience as Mediator

  • Highly accredited and practising International Commercial Mediator.
  • Hold the highest academic and professional qualifications with extensive work in the commercial sector nationally and internationally including mediating by telephone.
  • Highly experienced in mediating construction, property, commercial and other disputes with a high success rate in mediated settlements, 93%.            

Recent Settled Mediations

  • Breach of a commercial contract by an international bank's client company, UAE
  • Disputed vehicle fleet warranty between the manufacturers, dealer and client company
  • Breaches in engineering and building works under the Amended FIDIC Red Book, Qatar
  • Building defects in council-let properties
  • Structural failures in a block of flats
  • Non-payment for live advertising screens for a telecommunications company
  • Damp penetration/inadequate work affecting a block of flats
  • Medical negligence against a PCT Health Trust and a surgeon
  • Negligence claim against terraced housing design consultants
  • Non-payment of certified sums due in Qatar
  • Disputed footballer's conditional pay against club
  • Disputed late advice and remedial works
  • Unfair Director's dismissal
  • Defective premises dispute
  • Claim for damages on a luxury yacht purchase and maintenance
  • Damages for breach of covenants
  • Disputed variations for infrastructure works under the FIDIC Gold Book in Botswana
  • Breaches in Tenancy Agreement
  • Breaches of statutory duty by council
  • Non-compliance with notified disrepair works
  • Inadequate inspections by council for building defects
  • Lack of general care and attention to property
  • Non-payment of rents due
  • Mis-use of demised reconstructed properties
  • Changed specifications in a riverside building complex
  • Deficient road manhole frames and covers design, installation and alignment
  • Adverse pavement condition, maintenance and inspections in a town centre
  • Inadequate drainage systems causing flooding of a principal road
  • Non-compliant gullies installation, road surface and inspections for a principal road
  • Crumbling car park surfaces’ top course for a national supermarket chain
  • Failures in mechanical and electrical systems in a substantial commercial property
  • Operating shortcomings of oil storage in a gravity-based structure
  • Late completion of a flagship building complex in Dubai
  • Disputed installation and performance of facilities compressors for a heavy oil development
  • Improper construction and maintenance of pavement and kerbs at a golf club car park
  • Unsatisfactory safety, strength and maintenance of roof slabs
  • Unsound public parks' retaining walls and guardrails
  • Inappropriate nature of work, training and certification of plant operators
  • Instructed variations causing standing time and delay and disruption on piling works
  • Non-payment of certified sums due in Qatar
  • Defective screeding in a two-storey school and its rectification measures
  • Lack of maintenance of a rural road carriageway surface and absence of proper verges
  • Disputed pay formula terms in a footballer’s Contract
  • Deficient risk assessment in offshore facilities design, procurement, construction and operation
  • Deficient car park design for a golf club causing a slip and personal injury to users
  • Contested sums of inherited assets for beneficiaries including minors

Feedback

Feedback
Q1 (9.74)
Q2 (9.63)
Q3 (9.90)
Q4 (9.90)
Q5 (9.91)
Q6 (9.74)
Q7 (9.81)
Q8 (9.84)
Q9 (9.84)
Q10 (9.81)

History

History
  • Date

    Nature of dispute

    Outcome

  • Delay and Disruption
    Outcome: Settled
  • Suspension of Works
    Outcome: Settled
  • New Housing Development
    Outcome: Settled
  • Subcontractor's Final Account
    Outcome: Settled after date
  • Assets Recovery in Administration
    Outcome: Did Not Settle
  • Consultants' Fees
    Outcome: Settled
  • Hotel Refurbishment
    Outcome: Settled
  • Main Contractor's Final Account
    Outcome: Settled
  • Patent Infringement
    Outcome: Settled
  • Subcontractor's Variations Account
    Outcome: Adjourned
  • Late/Incomplete Consultants' Design
    Outcome: Settled
  • Patent Infringement
    Outcome: Settled
  • Landscaping Finishes Quality
    Outcome: Did Not Settle
  • Interior Design Shortcomings
    Outcome: Settled
  • Subcontractor's Variations Account
    Outcome: Settled
  • Delays to Cladding Works
    Outcome: Settled
  • Adj Commercial Developments Boundary
    Outcome: Settled
  • Gr II Listed Building Refurbishment
    Outcome: Settled
  • Non-compliant Fashion Items
    Outcome: Settled
  • Subcontractor's Final Account
    Outcome: Settled
  • Residential Development Planning
    Outcome: Settled
  • Infrastructure Works' Delay and Disruption
    Outcome: Settled
  • Underspecified Wine Quality
    Outcome: Settled
  • Partnership Dispute
    Outcome: Settled
  • Fashion Design Shortcomings
    Outcome: Settled
  • Contractors' Final Account
    Outcome: Settled
  • Personal Injury In Dock Offloading
    Outcome: Settled
  • Trademark Infringement
    Outcome: Settled
  • Trans-shipment Cargo Damage
    Outcome: Settled after date
  • Building Defects
    Outcome: Did Not Settle
  • Commercial Tenancy
    Outcome: Settled
  • Unpaid Bank Loan
    Outcome: Settled
  • Intellectual Property
    Outcome: Settled
  • Building Defects
    Outcome: Settled
  • Residential Development
    Outcome: Settled
  • Consultants' Fees
    Outcome: Settled
  • Couriers Franchise
    Outcome: Settled
  • Mineral Extraction
    Outcome: Settled
  • City Centre Shopping Development
    Outcome: Settled
  • Estate Development
    Outcome: Settled
  • Commercial Development
    Outcome: Settled
  • Project Finance
    Outcome: Settled
  • Copyrights Infringement
    Outcome: Settled
  • Consumer Contract
    Outcome: Settled
  • Building Disrepair Works
    Outcome: Settled
  • Commercial Let
    Outcome: Settled
  • Company's Name Passing off
    Outcome: Settled
  • Professional Negligence
    Outcome: Settled
  • Supertall Towers' Engineers' Fees - (Dubai)
    Outcome: Settled
  • Telecoms Commercial Management
    Outcome: Settled
  • Main Pipeline Works
    Outcome: Settled
  • Offshore Gas Installations
    Outcome: Settled
  • Professional Negligence
    Outcome: Did Not Settle
  • Adoining Commercial Properties
    Outcome: Settled
  • Company Liquidation
    Outcome: Settled
  • Consultants' Fees (Kazakhstan)
    Outcome: Adjourned
  • Consultants' Fees - (Kazakhstan)
    Outcome: Adjourned
  • Agency Representation
    Outcome: Settled
  • Telecommunications
    Outcome: Settled
  • Transport Infrastructure
    Outcome: Settled
  • Corporate Law
    Outcome: Did Not Settle
  • Energy
    Outcome: Settled
  • Franchising
    Outcome: Settled
  • Distribution
    Outcome: Settled
  • Architects' Fees
    Outcome: Settled
  • Stock Market Investment
    Outcome: Settled
  • Medical Negligence involving a PCT
    Outcome: Settled
  • Professional Negligence
    Outcome: Settled
  • Reinsurance Claims
    Outcome: Settled
  • Franchisees' non-compliance with Set Requirements
    Outcome: Settled
  • Commercial IT Fit Out
    Outcome: Settled
  • Retail Franchisee
    Outcome: Settled
  • Partnership Agreement Dispute
    Outcome: Settled
  • Repayment of Commercial Debts
    Outcome: Settled
  • M & E Installation & Commissioning
    Outcome: Settled
  • Building Dispute
    Outcome: Settled
  • Reinsurance of Imported Bldg Materials
    Outcome: Settled
  • Release of Surety
    Outcome: Settled
  • Department Store Franchise
    Outcome: Settled
  • Marine Vessel Maintenance
    Outcome: Settled
  • Sea Outfall Works
    Outcome: Settled
  • Oil & Gas Sea Water Cooling System
    Outcome: Settled
  • Building & MEP Works
    Outcome: Settled
  • Farm Co-op Assets
    Outcome: Settled
  • Manufacturing Plant Failure
    Outcome: Settled
  • Partnership Agreement
    Outcome: Settled
  • Tripartite Building Works
    Outcome: Settled
  • Architectural Designs
    Outcome: Settled
  • Project Financing
    Outcome: Settled
  • 21 m Long Cruiser Boat Maintenance
    Outcome: Settled
  • Gas & Oil Ancillary Works
    Outcome: Settled
  • Repayment of Commercial Bank Loan
    Outcome: Settled
  • Disputed Sport Facilities Completion
    Outcome: Settled
  • Professional Negligence
    Outcome: Settled
  • Offshore Gas & Oil Infrastructure Kazakhstan
    Outcome: Settled
  • Offshore Gas & Oil Infrastructure (Kazakhstan)
    Outcome: Settled
  • HVAC
    Outcome: Settled
  • Unfair Director's Dismissal
    Outcome: Settled
  • Marine Works
    Outcome: Settled
  • Sea Outfall Works
    Outcome: Settled
  • Commercial Property Renovation
    Outcome: Settled
  • Commercial Fitout
    Outcome: Did Not Settle
  • Incompliant Yacht Repairs
    Outcome: Settled
  • Disputed Final Accounts
    Outcome: Settled
  • Disputed Insurance Works
    Outcome: Did Not Settle
  • Non-Payment of Yacht Purchase Instalments
    Outcome: Settled
  • Unpaid Variations
    Outcome: Settled
  • Architect's Instructions
    Outcome: Settled
  • Medical Negligence
    Outcome: Settled
  • Deficient Yacht Maintenance
    Outcome: Settled
  • Shares Investment
    Outcome: Settled
  • Commercial Driveway Reconstruction
    Outcome: Settled
  • Coach Hire
    Outcome: Settled
  • Disputed Charity's Constitution
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Substandard Building Works
    Outcome: Settled
  • Specification Non-Compliance
    Outcome: Settled
  • Building Defects
    Outcome: Settled
  • Shared Utilities
    Outcome: Settled
  • Office Building Refurbishment
    Outcome: Settled
  • Property Sale
    Outcome: Settled
  • ICT
    Outcome: Settled
  • Pharmaceutical
    Outcome: Settled
  • Asset Management
    Outcome: Settled
  • Building Owners' Consent
    Outcome: Settled
  • Unfair Director's Dismissal
    Outcome: Settled
  • Highway Protective Systems
    Outcome: Settled
  • City Investment
    Outcome: Settled
  • Monthly Valuations am
    Outcome: Settled
  • Architect's Instructions pm
    Outcome: Settled
  • Defects Liability Non-compliance
    Outcome: Settled
  • Export Agreement
    Outcome: Settled
  • Copyright Breaches
    Outcome: Settled
  • Intrusive Testing
    Outcome: Did Not Settle
  • Unfair Director's Dismissal
    Outcome: Settled
  • Architects' Designs
    Outcome: Settled
  • Housing Infrastructure Disputes - am
    Outcome: Settled
  • Building Refurbishment
    Outcome: Settled
  • Architects' Designs
    Outcome: Partial Settlement
  • Internet Support
    Outcome: Settled
  • Building Insurance
    Outcome: Settled
  • Yacht Purchase/Maintenance
    Outcome: Settled
  • Tunneling works
    Outcome: Settled
  • Disputed Architect's Designs
    Outcome: Settled
  • Building Refurbishment
    Outcome: Settled
  • Tunnelling Dispute
    Outcome: Settled
  • Leaseholders Tenancy
    Outcome: Settled
  • Highway Maintenance
    Outcome: Settled
  • Architect's Instructions
    Outcome: Settled
  • Internet Support
    Outcome: Settled
  • Share Investment & Sale
    Outcome: Settled
  • Employment
    Outcome: Did Not Settle
  • Financial Services
    Outcome: Settled
  • Competition Breaches
    Outcome: Settled
  • Yacht Purchase/maintenance
    Outcome: Did Not Settle
  • Professional Negligence
    Outcome: Settled
  • Building Defects
    Outcome: Settled
  • Defective Works
    Outcome: Settled
  • Non-compliant Plants Order
    Outcome: Settled
  • Disputed Fees
    Outcome: Settled
  • Professional Negligence
    Outcome: Settled
  • Waste Management Contract
    Outcome: Settled
  • Extension of Time and Loss and Expense
    Outcome: Settled
  • Internet Supply and Services
    Outcome: Settled
  • Professional Negligence
    Outcome: Settled
  • Professional Indemnity
    Outcome: Settled
  • Re-insurance Claims
    Outcome: Settled
  • Breach of Contract
    Outcome: Settled
  • Defective Works
    Outcome: Settled
  • Final Account
    Outcome: Settled
  • Non-payment for Variations
    Outcome: Settled
  • Share Sales
    Outcome: Settled
  • Non-Payment of Consultants' Fees
    Outcome: Settled
  • Variation Account (am)
    Outcome: Settled
  • Delay and Disruption (pm)
    Outcome: Settled
  • Investment Repayment
    Outcome: Did Not Settle
  • Commercial - Mediated by Telephone
    Outcome: Settled
  • Assets Management
    Outcome: Settled
  • Telecoms Network Service
    Outcome: Did Not Settle
  • Unfair Director's Dismisal
    Outcome: Settled
  • Building Defects
    Outcome: Settled
  • Housing Infrastructure Disputes
    Outcome: Settled
  • Housing Infrasturcture Disputes - am
    Outcome: Settled
  • Housing Infrastructure Dispute - pm
    Outcome: Settled
  • Yacht Purchase & Maintenance Contract
    Outcome: Settled
  • Site variations
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Partial Settlement
  • Commercial
    Outcome: Settled
  • Partnership dispute
    Outcome: Did Not Settle
  • Medical negligence
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Contract breaches
    Outcome: Adjourned
  • Negligence
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Medical negligence
    Outcome: Partial Settlement
  • Shared rights
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Non-compliance with Spec
    Outcome: Adjourned
  • Landlord/Tenant Dispute
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Contract breaches
    Outcome: Did Not Settle
  • Medical Negligence
    Outcome: Did Not Settle
  • Non Payment of Retention Monies
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Office Rental
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Religious Community's Service
    Outcome: Settled
  • Telephone Mediation, Contract Breaches
    Outcome: Settled
  • Building Defects
    Outcome: Settled
  • Land Ownership
    Outcome: Did Not Settle
  • Boundary Alignment
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Drainage Dispute
    Outcome: Settled
  • Planning Disputes
    Outcome: Settled
  • Partnership Split
    Outcome: Settled
  • Environmental Impact Effects
    Outcome: Settled
  • Leaseholder's Breaches of Tenancy Terms
    Outcome: Settled
  • Quality of Building Construction
    Outcome: Settled
  • Medical Negligence
    Outcome: Partial Settlement
  • Wall Construction
    Outcome: Settled
  • Quality of Works
    Outcome: Settled after date
  • Mediating by Telephone - Breach of Contract
    Outcome: Settled
  • Footballer's Extra Pay
    Outcome: Settled
  • Disputed Terms of Tenancy Agreement
    Outcome: Settled after date
  • Debt Payment
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Absent East Verge on a Class A Road
    Outcome: Settled
  • Building Deficiencies
    Outcome: Settled
  • Mediating by Telephone - Manufacturer's Warranty
    Outcome: Settled
  • Building Disputes
    Outcome: Settled
  • Damp Penetration Work on a Block of Flats
    Outcome: Settled
  • Railway Embankment Problems
    Outcome: Settled
  • Non-Payment of Yacht Purchase Instalments
    Outcome: Settled
  • Medical Negligence Against a PCT and a Surgeon
    Outcome: Settled
  • Breaches of Statutory Duty by Council
    Outcome: Did Not Settle
  • Negligence Claim Against Housing Design Consultant
    Outcome: Settled
  • Vehicle Warranty
    Outcome: Settled
  • Breaches of Statutory Duty by Council
    Outcome: Settled
  • Disputed Late Remedial Works and Delayed Advice
    Outcome: Settled
  • Defects in Council Let Properties
    Outcome: Settled
  • Mediating by Telephone - Non-Payment of Fees
    Outcome: Settled
  • Structural Failures in a Block of Flats
    Outcome: Settled
  • International Bank's Client Breaches
    Outcome: Settled
  • Non-payment for Telecoms Live Screen Advertising
    Outcome: Settled
  • Non-Payment of Rents Due
    Outcome: Settled
  • Defective Premises Dispute
    Outcome: Settled
  • Damages for Breach of Covenants
    Outcome: Settled
  • Breaches in Tenancy Agreement
    Outcome: Settled
  • Breaches in Tenancy Agreement
    Outcome: Settled
  • Non-Compliance with Notified Disrepair Works
    Outcome: Settled
  • Breaches in Tenancy Agreement
    Outcome: Partial Settlement
  • Breaches of Statutory Duty by Council
    Outcome: Settled
  • Non-Compliance with Notified Disrepair Works
    Outcome: Settled after date
  • Mediating by Telephone - Car Manufacture Defects
    Outcome: Settled
  • Lack of General Care and Attention to Property
    Outcome: Partial Settlement
  • Mis-Use of Demised Reconstructed Properties
    Outcome: Settled
  • Deficient Road Drainage System Design
    Outcome: Settled
  • Adverse Pavement Condition in a Town Centre
    Outcome: Settled
  • Inadequate Drainage Systems in a Principal Road
    Outcome: Settled
  • Crumbling Car Park Surface for a National Chain
    Outcome: Settled
  • Incompliant Gullies Installation and Road Surface
    Outcome: Settled
  • Deficient Gullies Installation in a Principal Road
    Outcome: Did Not Settle
  • Inadequate Surveys by Council for Building Defects
    Outcome: Settled
  • Standing Time on Building Foundations
    Outcome: Settled
  • Changed Specifications in a Building Complex
    Outcome: Settled
  • Improper Pavement Construction and Maintenance
    Outcome: Did Not Settle
  • Unsafe Public Parks Retaining Walls and Guardrails
    Outcome: Settled
  • Unsatisfactory Strength and Maintenance of Roofs
    Outcome: Settled
  • Inappropriate Nature of Plant Operators' Training
    Outcome: Settled
  • Delay and Disruption due to Instructed Variations
    Outcome: Settled
  • Defective Screeds in a Two-Storey School
    Outcome: Settled
  • Lack of Maintenance of a Rural Road Carriageway
    Outcome: Settled
  • Disputed Beneficiaries' Sums Including Minors
    Outcome: Settled
  • Deficient Car Park Design for a Golf Club
    Outcome: Settled
  • Disputed Boundary Wall Protrusions
    Outcome: Settled
  • Damp Penetration at Adjoining Roofs Joint
    Outcome: Partial Settlement
  • Commercial
    Outcome: Settled
  • Non-Repayment of an International Bank's Loan
    Outcome: Settled
  • Breach of Commercial Contract Terms of Supply
    Outcome: Partial Settlement
  • Misuse of Temporary Film Studio Facilities
    Outcome: Settled
  • Letting of a Promotion Venue
    Outcome: Settled
  • Personal Injury During Building Works
    Outcome: Settled
  • Ineffectiveness of Garden Centre Plant Fertilisers
    Outcome: Settled
  • Effects of Maple Trees on a Nearby Building Block
    Outcome: Settled
  • Building Extension Designer's Shortcomings
    Outcome: Settled
  • Dissolved Partnership Disputed Equities
    Outcome: Did Not Settle
  • Brickwork Colour Mismatch
    Outcome: Settled
  • Commercial Vehicle Lease Termination
    Outcome: Settled
  • Commercial Nursery Plants
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Failure of HVAC Plant
    Outcome: Did Not Settle
  • Disputed Will Involving a Minor
    Outcome: Did Not Settle
  • PCT and a Surgeon' Negligence
    Outcome: Settled
  • Professional Negligence Against a Consultant
    Outcome: Settled after date
  • Holiday Let
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Film Studio Premises
    Outcome: Settled
  • Unfair Dismissal
    Outcome: Settled
  • Financial Advice
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Partial Settlement
  • Commercial 3 Hours
    Outcome: Settled
  • Commercial 3 Hours
    Outcome: Settled
  • Commercial
    Outcome: Partial Settlement
  • Cab Share Arrangements
    Outcome: Settled
  • Company Management Dispute
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Disputed Claim Loss Adjustment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Wrongful Arrest and Mistreatment
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Planning Issues with the LPA
    Outcome: Settled
  • Commercial
    Outcome: Partial Settlement
  • Commercial
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Online Fraud
    Outcome: Partial Settlement
  • Commercial
    Outcome: Did Not Settle
  • Holiday Insurance Policy
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Transport Planning Flaws by a Consultant
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Partial Settlement
  • Personal Injury from Failed Agricultural Machinery
    Outcome: Settled
  • Trading Terms of a Shop within a Department Store
    Outcome: Partial Settlement
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Venue Letting for a Musical Event
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Leaseholder's Breaches of Tenancy Terms
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Commercial
    Outcome: Did Not Settle
  • Leaseholder's Breaches of Tenancy Terms
    Outcome: Partial Settlement
  • Commercial
    Outcome: Settled
  • Local Authority's Rent Payments
    Outcome: Settled
  • Personal Injury Compensation
    Outcome: Settled
  • Medical Negligence
    Outcome: Settled
  • Breaches of Employment Terms
    Outcome: Settled
  • Non-Payment of Bank Loan
    Outcome: Settled
  • Lack of Building Maintenance
    Outcome: Partial Settlement
  • Breaches of Tenancy Agreement
    Outcome: Adjourned
  • LA's Lack of Care
    Outcome: Settled
  • Non-Payment of Fees
    Outcome: Settled
  • Medical negligence
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Employment
    Outcome: Settled
  • Medical negligence
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Distribution of Estate
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Adjourned
  • Commercial
    Outcome: Adjourned
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Personal injury
    Outcome: Settled
  • Debt payment
    Outcome: Settled
  • Medical negligence
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Adjourned
  • Commercial
    Outcome: Settled
  • Court annexed
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Personal injury
    Outcome: Partial Settlement
  • Insurance
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Building maintenance
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Annex works
    Outcome: Did Not Settle
  • Building works
    Outcome: Settled
  • Inheritance
    Outcome: Did Not Settle
  • Travel
    Outcome: Did Not Settle
  • Inheritance
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Court annexed
    Outcome: Settled after date
  • Residential
    Outcome: Settled
  • Commercial
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Residential
    Outcome: Settled
  • Commercial
    Outcome: Partial Settlement
  • Commercial
    Outcome: Partial Settlement
  • Landscaping
    Outcome: Settled
  • Structural maintenance
    Outcome: Settled
  • Residential
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Transport
    Outcome: Did Not Settle
  • Personal injury
    Outcome: Settled
  • Inheritance
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Telecoms
    Outcome: Settled
  • Insurance
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Residential
    Outcome: Settled after date
  • Residential
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Agricultural
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Adjourned
  • Banking
    Outcome: Did Not Settle
  • Negligence
    Outcome: Settled
  • Family dispute
    Outcome: Settled
  • Personal injury
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Partial Settlement
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Boundary dispute
    Outcome: Settled
  • Contract breaches
    Outcome: Partial Settlement
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Boundary dispute
    Outcome: Settled
  • Medical negligence
    Outcome: Did Not Settle
  • Inheritance
    Outcome: Settled
  • Construction defects
    Outcome: Settled
  • Commercial
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Adjourned
  • Delayed work
    Outcome: Did Not Settle
  • Commercial
    Outcome: Did Not Settle
  • Contract breaches
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Medical negligence
    Outcome: Settled
  • Digital transfer media
    Outcome: Settled
  • Payments default
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Contract breaches
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Partial Settlement
  • Employment
    Outcome: Settled
  • Personal injury
    Outcome: Settled
  • Construction delays
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Rent review
    Outcome: Settled
  • Residential tenancies (am)
    Outcome: Settled
  • Employment (pm)
    Outcome: Adjourned
  • Employment
    Outcome: Settled
  • Personal injury
    Outcome: Settled
  • Construction delays
    Outcome: Did Not Settle
  • Personal injury
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Site variations
    Outcome: Settled
  • Employment
    Outcome: Settled after date
  • Personal injury
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Professional Negligence
    Outcome: Settled
  • Medical negligence
    Outcome: Settled
  • Medical negligence
    Outcome: Settled
  • Contract breaches
    Outcome: Did Not Settle
  • Employment
    Outcome: Partial Settlement
  • Commercial
    Outcome: Settled
  • Contract breaches
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial - Mediated by Telephone
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Telecommunications Netwrok
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Boundary Dispute
    Outcome: Settled
  • Fees
    Outcome: Settled
  • Negligence
    Outcome: Did Not Settle
  • Building Defects
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Telecoms Advertising
    Outcome: Settled
  • Extension of Time
    Outcome: Settled
  • Instructed Variations
    Outcome: Settled
  • Final Account
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Consultants Fees
    Outcome: Settled
  • Breaches of Lease Terms
    Outcome: Did Not Settle
  • Personal Injury
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Building Works Defects
    Outcome: Settled
  • Site Possession
    Outcome: Settled
  • Employment
    Outcome: Settled after date
  • Drainage Failures
    Outcome: Settled
  • Deficient Works
    Outcome: Settled
  • Breach of Contract
    Outcome: Settled
  • Extension of Time (am)
    Outcome: Settled
  • Architect's Instructions (pm)
    Outcome: Settled
  • Yacht Purchase & Maintenance
    Outcome: Settled
  • Land Decontamination
    Outcome: Partial Settlement
  • Tenancy Agreement
    Outcome: Settled
  • Partnership Dispute
    Outcome: Did Not Settle
  • Personal Injury
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial Bank Loan
    Outcome: Settled
  • Re-insurance Claims
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Partnership Dispute
    Outcome: Settled
  • Professional Negligence
    Outcome: Did Not Settle
  • Consultants' Fees
    Outcome: Settled after date
  • Personal Injury
    Outcome: Did Not Settle
  • Professional Indemnity
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Bank Loan Default
    Outcome: Did Not Settle
  • Varied Designs
    Outcome: Did Not Settle
  • Employment
    Outcome: Settled
  • Boundary Dispute
    Outcome: Did Not Settle
  • Personal Injury
    Outcome: Settled
  • Dismissal Without Notice
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Employment
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Adjourned
  • Commercial
    Outcome: Partial Settlement
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Did Not Settle
  • Boat Purchase Contract
    Outcome: Did Not Settle
  • Breach of Contract
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Contract Breaches
    Outcome: Did Not Settle
  • Boat Maintenance Contract
    Outcome: Settled
  • Loan Repayment
    Outcome: Did Not Settle
  • Personal Injury
    Outcome: Settled
  • Design Deficiencies
    Outcome: Settled
  • Extension of time
    Outcome: Settled
  • Delay and Disruption
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Non-compliance with the Specifications
    Outcome: Settled
  • Building Defects
    Outcome: Did Not Settle
  • Telecommunications
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Non-payment of Invoices
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Safety Breaches
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Loss and Expense
    Outcome: Settled
  • Unfair Dismissal
    Outcome: Settled
  • Personal Injury
    Outcome: Adjourned
  • Commercial
    Outcome: Settled
  • Unfair Dismissal
    Outcome: Settled
  • Personal Injury
    Outcome: Did Not Settle
  • Non-payment of Fees
    Outcome: Settled
  • Repayment of Loan
    Outcome: Settled
  • Building Defects
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Partial Settlement
  • Commercial
    Outcome: Partial Settlement
  • Solicitor's Instructions
    Outcome: Partial Settlement
  • Car Park Paving
    Outcome: Settled
  • IFA's Services
    Outcome: Partial Settlement
  • Personal Injury
    Outcome: Settled
  • Boundary Dispute
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Debt Repayment
    Outcome: Did Not Settle
  • Employment
    Outcome: Settled
  • Re-insurance Claim
    Outcome: Settled
  • Health Trust Negligence
    Outcome: Settled
  • Commercial
    Outcome: Adjourned
  • Boundary Dispute
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Personal Injury
    Outcome: Did Not Settle
  • Personal Injury
    Outcome: Did Not Settle
  • Commercial
    Outcome: Settled
  • Personal Injury
    Outcome: Did Not Settle
  • Employment
    Outcome: Settled
  • Infrastructure Works
    Outcome: Settled
  • Boats Maintenance
    Outcome: Settled
  • Buidling Works
    Outcome: Did Not Settle
  • Personal Injury
    Outcome: Settled
  • Architect's Variations
    Outcome: Settled
  • Bank Loan
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Debt Repayment
    Outcome: Did Not Settle
  • Unfair Dismissal
    Outcome: Settled
  • Structural Engineers' Design
    Outcome: Settled
  • Landscaping Deficiencies
    Outcome: Settled
  • Non-compliant Surface Dressing
    Outcome: Settled
  • Estate Management
    Outcome: Settled
  • Director's Dismissal
    Outcome: Settled
  • Property Maintenance
    Outcome: Settled
  • Medical Negligence
    Outcome: Settled
  • Farm Management
    Outcome: Settled
  • Personal Injury
    Outcome: Did Not Settle
  • Personal Injury
    Outcome: Settled
  • Holiday Let
    Outcome: Adjourned
  • Disputed Final Account
    Outcome: Did Not Settle
  • Unfair Dismissal
    Outcome: Did Not Settle
  • Reinsurance
    Outcome: Settled
  • Damaged Utilites
    Outcome: Settled
  • Excessive Fees
    Outcome: Did Not Settle
  • Substandard Building Finishes
    Outcome: Settled
  • Employment
    Outcome: Settled
  • ICT
    Outcome: Settled after date
  • Stocks and Shares Investment
    Outcome: Settled
  • Artwork Design
    Outcome: Settled
  • Advertising
    Outcome: Settled
  • Structural Steel Fabrication
    Outcome: Settled
  • Delayed Imports
    Outcome: Settled
  • Commercial Leases
    Outcome: Settled
  • City Centre Office Building
    Outcome: Settled
  • Telecommunications
    Outcome: Settled
  • Employment
    Outcome: Adjourned
  • Mechanical and electrical Subcontract
    Outcome: Settled
  • Docks Maintenance
    Outcome: Settled
  • Debt Repayment
    Outcome: Did Not Settle
  • Delayed Works Completion
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Unfair Dismissal
    Outcome: Did Not Settle
  • Personal Injury
    Outcome: Did Not Settle
  • Employment
    Outcome: Did Not Settle
  • Building Works Supervision
    Outcome: Settled
  • Infrastructure Works
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Director's Dismissal
    Outcome: Did Not Settle
  • Delay & Disruption (AM)
    Outcome: Settled
  • Final Account (PM)
    Outcome: Settled
  • Architects' Desings
    Outcome: Settled
  • Boundary dDispute
    Outcome: Adjourned
  • Copyright Breaches
    Outcome: Did Not Settle
  • Lease Termination
    Outcome: Did Not Settle
  • Unfair Dismissal
    Outcome: Settled
  • Personal Injury
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Commercial
    Outcome: Did Not Settle
  • Employment
    Outcome: Settled
  • Breach of Contract
    Outcome: Partial Settlement
  • Commercial
    Outcome: Settled
  • Residential Property dispute
    Outcome: Settled
  • Loan default
    Outcome: Partial Settlement
  • Contract breaches
    Outcome: Settled
  • Survey shortcomings
    Outcome: Settled
  • Employemtn
    Outcome: Settled
  • Medical negligence
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Multi tenancy dispute
    Outcome: Settled
  • Medical negligence
    Outcome: Settled
  • Employment
    Outcome: Adjourned
  • Boundary dispute
    Outcome: Settled after date
  • Partnership dispute
    Outcome: Settled
  • Contract breaches
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Profit sharing dispute
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Telephone mediation
    Outcome: Settled
  • Contract breaches
    Outcome: Settled
  • Contract breaches
    Outcome: Settled
  • Financial advisor services
    Outcome: Did Not Settle
  • Contract breaches
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Contract breaches
    Outcome: Settled after date
  • Medical negligence
    Outcome: Settled
  • Boundary dispute
    Outcome: Settled
  • Variation to contract
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Personal injury
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Partnership dispute
    Outcome: Settled
  • Contract breaches
    Outcome: Settled
  • Commercial
    Outcome: Partial Settlement
  • Personal injury
    Outcome: Settled
  • Contract breaches
    Outcome: Settled after date
  • Commercial
    Outcome: Settled
  • Partnership dispute
    Outcome: Settled
  • Survey shortcomings
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Boundary dispute
    Outcome: Settled
  • Variation to contract
    Outcome: Did Not Settle
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Profit sharing dispute
    Outcome: Settled
  • Contract breaches
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Employement
    Outcome: Settled
  • Personal injury
    Outcome: Settled
  • Personal injury
    Outcome: Settled
  • Leasehold covenants breaches
    Outcome: Settled
  • Medical negligence
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Commercial
    Outcome: Did Not Settle
  • Neighbours' dispute
    Outcome: Settled
  • Partnership equity share
    Outcome: Settled
  • Employment
    Outcome: Settled
  • Employment
    Outcome: Settled after date
  • Delayed completion damages
    Outcome: Settled
  • Financial advisory shortcomings
    Outcome: Settled
  • Flat share dispute
    Outcome: Settled
  • Shared ownership defaults
    Outcome: Partial Settlement
  • Commercial
    Outcome: Adjourned
  • Commercial
    Outcome: Partial Settlement
  • Employment
    Outcome: Settled
  • Commercial
    Outcome: Settled
  • Inheritance
    Outcome: Settled
  • Contract breaches
    Outcome: Partial Settlement
  • Employment
    Outcome: Settled
  • Bank loan repayment
    Outcome: Settled
  • Partnership dispute
    Outcome: Adjourned
  • Estate distribution
    Outcome: Settled
  • Medical negligence
    Outcome: Partial Settlement
  • Medical negligence
    Outcome: Settled
  • Employment
    Outcome: Settled

Insurance

Insurance
  • Insurance Provider Hiscox
  • Certificate Status Certificate on file
  • Expiry Date 31 December 2018
  • Level of Cover 1000000

CPD & Training

CPD & Training
  • Mediation Training Provider Academy of Experts
  • Date Qualified as Mediator 1 October 1993
  • Training Certificate Download PDF

Approved Mediator

Approved Mediator Database Status - Compliant EU/CMC/MOJ Compliance checked
  • Profile submitted βœ“ Checked
  • Independent feedback βœ“ Checked
  • History βœ“ Checked
  • Insurance provider βœ“ Checked
  • Insurance certificate βœ“ Checked
  • Expiry date βœ“ Checked
  • Level of cover βœ“ Checked
  • Training requirement βœ“ Checked
  • Qualification date βœ“ Checked
  • Training certificate βœ“ Checked
  • E.U. Code of conduct βœ“ Checked
  • Observations completed βœ“ Checked
  • Annual CPD log βœ“ Checked
  • Mediator status βœ“ Checked
  • Specialist panels βœ“ Checked
  • Geographical location βœ“ Checked
  • Professional status βœ“ Checked
  • League table position βœ“ Checked

Approved Mediator - Clerksroom Mediator Database

Can't find what you are looking for or prefer to talk? Call Us On 01823 247 247